Installation

Install with CLI Recommended
gh skills-hub install devops-rollout-plan

Don't have the extension? Run gh extension install samueltauil/skills-hub first.

Download and extract to your repository:

.github/skills/devops-rollout-plan/

Extract the ZIP to .github/skills/ in your repo. The folder name must match devops-rollout-plan for Copilot to auto-discover it.

Skill Files (1)

SKILL.md 3.9 KB
---
name: devops-rollout-plan
description: 'Generate comprehensive rollout plans with preflight checks, step-by-step deployment, verification signals, rollback procedures, and communication plans for infrastructure and application changes'
---

# DevOps Rollout Plan Generator

Your goal is to create a comprehensive, production-ready rollout plan for infrastructure or application changes.

## Input Requirements

Gather these details before generating the plan:

### Change Description
- What's changing (infrastructure, application, configuration)
- Version or state transition (from/to)
- Problem solved or feature added

### Environment Details
- Target environment (dev, staging, production, all)
- Infrastructure type (Kubernetes, VMs, serverless, containers)
- Affected services and dependencies
- Current capacity and scale

### Constraints & Requirements
- Acceptable downtime window
- Change window restrictions
- Approval requirements
- Regulatory or compliance considerations

### Risk Assessment
- Blast radius of change
- Data migrations or schema changes
- Rollback complexity and safety
- Known risks

## Output Format

Generate a structured rollout plan with these sections:

### 1. Executive Summary
- What, why, when, duration
- Risk level and rollback time
- Affected systems and user impact
- Expected downtime

### 2. Prerequisites & Approvals
- Required approvals (technical lead, security, compliance, business)
- Required resources (capacity, backups, monitoring, rollback automation)
- Pre-deployment backups

### 3. Preflight Checks
- Infrastructure health validation
- Application health baseline
- Dependency availability
- Monitoring baseline metrics
- Go/no-go decision checklist

### 4. Step-by-Step Rollout Procedure
**Phases**: Pre-deployment, deployment, progressive verification
- Specific commands for each step
- Validation after each step
- Duration estimates

### 5. Verification Signals
**Immediate** (0-2 min): Deployment success, pods/containers started, health checks passing
**Short-term** (2-5 min): Application responding, error rates acceptable, latency normal
**Medium-term** (5-15 min): Sustained metrics, stable connections, integrations working
**Long-term** (15+ min): No degradation, capacity healthy, business metrics normal

### 6. Rollback Procedure
**Decision Criteria**: When to initiate rollback
**Rollback Steps**: Automated, infrastructure revert, or full restore
**Post-Rollback Verification**: Confirm system health restored
**Communication**: Stakeholder notification

### 7. Communication Plan
- Pre-deployment (T-24h): Schedule and impact notice
- Deployment start: Commencement notice
- Progress updates: Status every X minutes
- Completion: Success confirmation
- Rollback (if needed): Issue notification

**Stakeholder Matrix**: Who to notify, when, via what method, with what content

### 8. Post-Deployment Tasks
- Immediate (1h): Verify criteria met, review logs
- Short-term (24h): Monitor metrics, review errors
- Medium-term (1 week): Post-deployment review, lessons learned

### 9. Contingency Plans
Scenarios: Partial failure, performance degradation, data inconsistency, dependency failure
For each: Symptoms, response, timeline

### 10. Contact Information
- Primary and secondary on-call
- Escalation path
- Emergency contacts (infrastructure, security, database, networking)

## Plan Customization

Adapt based on:
- **Infrastructure Type**: Kubernetes, VMs, serverless, databases
- **Risk Level**: Low (simplified), medium (standard), high (additional gates)
- **Change Type**: Code deployment, infrastructure, configuration, data migration
- **Environment**: Production (full plan), staging (simplified), development (minimal)

## Remember

- Always have a tested rollback plan
- Communicate early and often
- Monitor metrics, not just logs
- Document everything
- Learn from each deployment
- Never deploy on Friday afternoon (unless critical)
- Never skip verification steps
- Never assume "it should work"

License (MIT)

View full license text
MIT License

Copyright GitHub, Inc.

Permission is hereby granted, free of charge, to any person obtaining a copy of this software and associated documentation files (the "Software"), to deal in the Software without restriction, including without limitation the rights to use, copy, modify, merge, publish, distribute, sublicense, and/or sell copies of the Software, and to permit persons to whom the Software is furnished to do so, subject to the following conditions:

The above copyright notice and this permission notice shall be included in all copies or substantial portions of the Software.

THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT.